Power Trouble in Moodubelle: Memorandum Submitted to ‘Mescom’ Authorities


Write Comment     |     E-Mail To a Friend     |     Facebook     |     Twitter     |     Print
Report and Pictures by Anil Alva
Bellevision Media Network

Moodubelle, 16 April 2010: As a follow up of the recent agitation of the people of Moodubelle on 7th April 2010 in front of the Mescom section office against the erratic electric power supply, especially during the evening time when the school and college children had to appear for their annual examination, the agitating victims and their leaders were assured by the Mescom Section Officer, Mr. Sameer  that he will make arrangement to invite higher official of Mescom to hear their grievances. Accordingly, the Assistance Executive Engineer of Mescom, Mr. Shankar paid a visit to the Moodubelle Mescom office on 15th April 2010.

In a memorandum submitted to Mr. Shankar, the power consumers of Moodubelle have pointed out that during the evening and night time, whenever there is a break down in the 11 KV line, the people have to suffer without electricity due to the non-availability of linesmen to rectify the break down. As a result, people have to wait till the next day for the linesmen to come and restart the power supply.

Another problem pointed out in the Memorandum is that in the sub-section of Karkala, for Bailoor and Palli-Ninjoor, there is a provision for a separate 11-KV line. However, since last many days, due to the pressure from people of those areas, they have been supplied electric power from Moodubelle feeder line. This has resulted in additional load on the feeder line in Moodubelle that has been causing breakdown in power supply in practically every ten minutes. This has been causing a lot of inconvenience to the people. In the Memorandum, the people of Moodubelle have made a request to the Mescom authorities to supply electricity to Bailoor, Palli-Ninjoor areas through the separate 11-KV power line meant for these areas so that additional load is not put on the Moodubelle feeder line.

As load shedding is inevitable, it has been suggested to the Mescom authorities that it should inform the people the time of the load shedding and have the load shedding done in a rotational manner.

On behalf of the power consumers of Moodubelle, the Memorandum was submitted by Commodore Jerome Castelino to the Assistant Executive Engineer, Mr. Shankar. Addressing the agitated consumers, Mr. Shankar assured them that he will try to solve these problems faced by the people of Moodubelle as early as possible. Besides Mr. Shankar and Commodore Jerome Castelino, the meeting was attended by Mr. Sameer, the Section Officer of Mescom, Moodubelle,  Mr. Devdas Hebbar, Mr. A.K. Alva, Mr. Benedict Martis, mr. A.J. Alva, Mr. Rajendrsa Shetty Edemer as well as others. 

 

 

Write Comment     |     E-Mail To a Friend     |     Facebook     |     Twitter     |     Print
Write your Comments on this Article
Your Name
Native Place / Place of Residence
Your E-mail
Your Comment   You have characters left.
Security Validation
Enter the characters in the image above
    
Disclaimer: Kindly do not post any abusive, defamatory, infringing, obscene, indecent, discriminatory or unlawful material or SPAM. BelleVision.com reserves the right to block/ remove without notice any content received from users.
GTI MarigoldGTI Marigold
Anil Studio
Badminton Sports AcademyBadminton Sports Academy

Now open at Al Qusais

Veez Konkani IllustratedVEEZ Konkani

Weekly e-Magazine

New State Bank of India, Customer Service Point
Cool House ConstructionCool House Construction
Uzvaad FortnightlyUzvaad Fortnightly

Call : 91 9482810148

Your ad Here
Power Care
Ryan Intl Mangaluru
Ryan International
pearl printing
https://samuelsequeira.substack.com/publish
Omintec
Kittall.ComKittall.Com

Konkani Literature World

Konkanipoetry.com
Bluechem