Rickshaw and tempo drivers protest the bad condition of the road at Ganapana Katte


Write Comment     |     E-Mail To a Friend     |     Facebook     |     Twitter     |     Print
Report and Pictures by Anil Alva
Bellevision Media Network

Moodubelle, 1 August 2010:  Being fed up with the apathy of the contractors who have undertaken the widening of the udupi-Karkala Road through Moodubelle as well as the lack of concern of the local elected representatives of the Grama Panchayat regarding the bad condition of the approach road especially at the Ganapana Katte, the rickshaw and tempo drivers staged a protest on Sunday, 1 August 2010 from 9.30 to 10 am. 

While undertaking the task of widening the road, the slopy patch of the road at Ganapana Katte  was dug up in order to make arrangement for a culvert which has not been completed so far. The ditch like depression on the road had been causing a lot of inconveneience to the vehicles. With the beginning of the rainy season, the situation became bad and with the incessant rains in the last week the condition of the road became worst. The mud that was used to fill the ditch on the raod has become so loose and slushy that the tyres of thee ssmaller vehicles including bikes get badly stuck up in the muck. Even pedestrians find it extremely difficult to cross that patch of the road without getting their footwear stuck in the loose mud.

Following the protest, the representative of the road contractor  rushed to the spot and assured that he would take immediate step to solve the problem of slush and loose mud and summoned the JCB machine and a tipper for the work. As they were promised that the necessary action would be taken to solidify the surface of the patch of the road for smooth vehicular transport, the rickshaw and tempo drivers called off their protest. However, they were quite unhappy that the local representatives of the people neither took up the matter on their own nor showed sympathy with the protestors by being present at the spot.    

 

 

Write Comment     |     E-Mail To a Friend     |     Facebook     |     Twitter     |     Print
Comments on this Article
Suraj-Belle, Moodubelle/Dubai Sun, August-1-2010, 1:30
Dayeg Annere road strike????? Thirenda rasthey onthey nigul javvaner serd sama mulpule atha…..!! e strike-wike nank panthina atth…
Naveen M., Moodubelle Sun, August-1-2010, 7:37
Unless and until public stage protest against this lethargic way of working of the road contractors, no one bothers. Elected members should start responding to public problems.
Write your Comments on this Article
Your Name
Native Place / Place of Residence
Your E-mail
Your Comment   You have characters left.
Security Validation
Enter the characters in the image above
    
Disclaimer: Kindly do not post any abusive, defamatory, infringing, obscene, indecent, discriminatory or unlawful material or SPAM. BelleVision.com reserves the right to block/ remove without notice any content received from users.
GTI MarigoldGTI Marigold
Anil Studio
Badminton Sports AcademyBadminton Sports Academy

Now open at Al Qusais

Veez Konkani IllustratedVEEZ Konkani

Weekly e-Magazine

New State Bank of India, Customer Service Point
Cool House ConstructionCool House Construction
Uzvaad FortnightlyUzvaad Fortnightly

Call : 91 9482810148

Your ad Here
Power Care
Ryan Intl Mangaluru
Ryan International
pearl printing
https://samuelsequeira.substack.com/publish
Omintec
Kittall.ComKittall.Com

Konkani Literature World

Konkanipoetry.com
Bluechem