Kadeshivalaya – Ajilamogar linking Souharda Bridge ready in 30 months – Ramanath Rai
Bellevision Media Network
Bantwal, 11 Jun: Kadeshivalaya – Ajilamogar linking Souharda Bridge is my brainchild, its realization has brought me happiness, said former minister B Ramanath Rai.
Addressing the media persons in front of Kadeshivalaya temple, after viewing the ongoing construction of bridge works, near here on Monday, June 10, Rai said that the proposal to lay the bridge was forwarded to the state administration during 2016 at an estimated cost of Rs 31 crore that was sanctioned in 2018. The tender was called for and awarded to KRDCL. The work is in progress and will be completed in 30 months.
ZP members B Padmashekar Jain, Chandraprakash Shetty and Manjula Mave, block Congress president Baby Kunder, Sudeep Kumar Shetty, TP vice president Abbas Ali, Maninalkoor gram panchayat president Geeta, youth Congress president Prashant Kulal, Mayeelappa Salian, Sampat Kumar Shetty, Eshwar Poojary, KRDCL assistant engineer Manjesh, contractor Raghavan were present at the media conference.