Hanging Bridge linking Kuppepadav & Badagabellore ready by June 2016


Write Comment     |     E-Mail To a Friend     |     Facebook     |     Twitter     |     Print
Bellevision Media Network

Mangaluru, 04 May 2016: Coastal Development Authority (CDA) chairman Nivedit Alva while on his visit reviewed the ongoing works of installing a hanging bridge linking Kuppepadav (that is now comes under Muttur gram panchayat) in Mangaluru taluk and Badagabellore gram panchayat in Batnwal taluk by CDA, here on Monday May 2.

 

 

The work is going on in full wing to install a hanging bridge at Kuppepadav, as per the assurances to the local villages that would benefit the people living on either side of Palguni river. The hanging bridge will have the length of 135 meters and 1.20 meter in width that will be laid at an estimated cost of Rs 146.59 lac. It would be operational by June 2016, said Alva.

 

Badagabellore gram panchayat vice president Yogish Poojary, CDA secretary Pradeep D’Souza, assistant executive engineer Ninga Setty was present on the occasion.

 

 

Write your Comments on this Article
Your Name
Native Place / Place of Residence
Your E-mail
Your Comment   You have characters left.
Security Validation
Enter the characters in the image above
    
Disclaimer: Kindly do not post any abusive, defamatory, infringing, obscene, indecent, discriminatory or unlawful material or SPAM. BelleVision.com reserves the right to block/ remove without notice any content received from users.
GTI MarigoldGTI Marigold
Anil Studio
Badminton Sports AcademyBadminton Sports Academy

Now open at Al Qusais

Veez Konkani IllustratedVEEZ Konkani

Weekly e-Magazine

New State Bank of India, Customer Service Point
Cool House ConstructionCool House Construction
Uzvaad FortnightlyUzvaad Fortnightly

Call : 91 9482810148

Your ad Here
Power Care
Ryan Intl Mangaluru
Ryan International
pearl printing
https://samuelsequeira.substack.com/publish
Omintec
Kittall.ComKittall.Com

Konkani Literature World

Konkanipoetry.com
Bluechem